Modular homes are the kind of homes that are built in a factory setting in modules. Each module is constructed separately and independently before all the modules are joined together to form a single structure. The quality control department of the company that is doing the building usually inspects the process of production carefully to ensure standards are followed. Thus, in the end all modules meet the same quality standards. Here are facts regarding South Hill VA modular homes.
These structures are usually not subjected to elements of weather like houses built traditionally are. That means that the production process is no interrupted by bad weather. As such, production can be done very fast. Also, the company can maintain a night shift crew that continues with the production even at night. In the end, the house is produced very fast.
Traditional construction of houses is affected by several factors like weather. When a storm comes, all construction activities have to be stopped until the storm passes. Also, the construction takes place during the day only in most instances, with the crew going back to their houses in the evening. This brings about delay in the construction. The house ends up taking up to several months to be completed and be ready for occupation.
A lot of people are going for modular houses due to the ease associated with their construction. The modules can be produced fast with the mean production period being four weeks. After completion, they are covered with suitable material so as to protect them from damage from the elements of weather while in transit. They are then taken to the construction site to be installed and finished up.
A foundation is usually made in advance at the site where the modules will be installed. Each module is installed individually on the foundation. The modules are offloaded from the transporting truck by use of a crane. They are placed onto the foundation by the crane in the required position. How this should be done is planned in advance.
Although the average time it takes to construct these structures is four weeks, the duration can vary a lot. The duration is affected by several factors such as the design of the structure. Complicated designs usually take longer because there is a lot of planning and designing involved in their production. Also, the size of the structure will matter because those that have more modules need more time to produce.
The installation process itself usually requires additional time to complete. The installation can be done by local builders or the production company. Most production companies prefer to do the installation themselves but the choice usually lies with the client. The client can choose whether to have the company do the installation or if they want to hire an outside contractor.
It is important to note that modular homes are not the same as mobile houses. The first difference between these two kinds of structures is mobility. Whereas mobile houses are mobile, modular homes are not mobile. They are installed on permanent foundations, which prevents them from being able to be moved.
These structures are usually not subjected to elements of weather like houses built traditionally are. That means that the production process is no interrupted by bad weather. As such, production can be done very fast. Also, the company can maintain a night shift crew that continues with the production even at night. In the end, the house is produced very fast.
Traditional construction of houses is affected by several factors like weather. When a storm comes, all construction activities have to be stopped until the storm passes. Also, the construction takes place during the day only in most instances, with the crew going back to their houses in the evening. This brings about delay in the construction. The house ends up taking up to several months to be completed and be ready for occupation.
A lot of people are going for modular houses due to the ease associated with their construction. The modules can be produced fast with the mean production period being four weeks. After completion, they are covered with suitable material so as to protect them from damage from the elements of weather while in transit. They are then taken to the construction site to be installed and finished up.
A foundation is usually made in advance at the site where the modules will be installed. Each module is installed individually on the foundation. The modules are offloaded from the transporting truck by use of a crane. They are placed onto the foundation by the crane in the required position. How this should be done is planned in advance.
Although the average time it takes to construct these structures is four weeks, the duration can vary a lot. The duration is affected by several factors such as the design of the structure. Complicated designs usually take longer because there is a lot of planning and designing involved in their production. Also, the size of the structure will matter because those that have more modules need more time to produce.
The installation process itself usually requires additional time to complete. The installation can be done by local builders or the production company. Most production companies prefer to do the installation themselves but the choice usually lies with the client. The client can choose whether to have the company do the installation or if they want to hire an outside contractor.
It is important to note that modular homes are not the same as mobile houses. The first difference between these two kinds of structures is mobility. Whereas mobile houses are mobile, modular homes are not mobile. They are installed on permanent foundations, which prevents them from being able to be moved.